The Water and Power Development Authority (WAPDA) and the Power Division have officially clarified the rules for installing more than one electricity meter in a single home. The new WAPDA Rules 2025 confirm that multiple electricity meters are still allowed if certain conditions are met.
This update brings relief to thousands of families, tenants, and landlords across Pakistan who were confused by rumors of a possible ban. Here’s everything you need to know about the latest government policy.

Can You Install More Than One Meter in 2025?
Yes. Under the WAPDA Rules 2025, there is no ban on installing a second or even third meter in a house. However, applicants must meet a few key requirements to prove that each household or portion is separate.
This step ensures fairness for genuine families while stopping misuse of subsidized electricity slabs.
Also Read: BISP October 2025 Payment Schedule by Cluster – Complete District List
Conditions for Additional Electricity Meters
To qualify for an additional meter, consumers must meet the following official conditions:
- The house portion must be clearly separated.
- Each unit should have its own entrance and exit.
- A separate kitchen must exist for each household.
- Independent electrical wiring or circuit is required.
- An affidavit confirming a separate household may be needed.
- Local DISCO officials (LESCO, FESCO, IESCO, etc.) will verify the site.
These checks ensure that only legitimate applicants receive additional meters.
Myths vs Facts: What’s True in 2025?
Rumor | Reality |
---|---|
Only one meter per house is allowed | ❌ False – Multiple meters are still allowed under rules |
All extra meters will be removed | ❌ False – Legal meters remain valid |
Tenants cannot apply for a new meter | ❌ Incorrect – Tenants can apply if they meet requirements |
Government banned additional meters | ❌ Wrong – No such ban has been issued |
Extra meters will face penalties | ❌ Misleading – Only misuse cases are monitored |
Old meters will be disconnected | ❌ False – Only illegal ones will be removed |

Step-by-Step: How to Apply for an Additional Electricity Meter
If you want to install another electricity meter in your home, follow these simple steps:
- Visit your nearest WAPDA or DISCO office (LESCO, FESCO, GEPCO, IESCO, K-Electric, etc.).
- Request and fill out the New Connection / Additional Meter form.
- Attach all required documents listed below.
- Wait for the site inspection and approval.
- Pay the security deposit and installation charges.
- Once approved, your new meter will be installed as per standard procedure.
Required Documents for Additional Meter Installation
Document | Purpose |
---|---|
CNIC copy | To verify applicant identity |
Proof of ownership or tenancy | Confirms property rights |
Affidavit of separate portion | Legal proof of separate unit |
Site verification report | Confirms physical separation |
Application form | Official record for WAPDA |
Payment receipt | Confirms deposit and processing |
Government Monitoring and New Rules in 2025
To prevent misuse of electricity slabs, the Power Division has launched a nationwide monitoring drive. The system now checks for multiple meters issued under the same CNIC or property address.
This step aims to detect and control subsidy misuse. However, genuine families, tenants, and landlords who meet the separation criteria have nothing to worry about — their applications remain valid and protected under WAPDA’s updated regulations.
Also Read: BISP October 2025 Payment: Rs 13,500 Installment Starts from 16th October — Full District List
Final Thought
The WAPDA New Policy 2025 makes it crystal clear: multiple electricity meters are still permitted in one house if each portion is separate and follows official requirements. This is a positive decision for joint families and tenants who want independent billing and fair usage.
By balancing fairness with strict monitoring, the government ensures transparency, reduces subsidy abuse, and supports citizens’ need for convenience.
If you plan to apply, keep your documents ready and ensure your portion meets all the separation conditions — your new connection can be installed smoothly without any hurdles.